External load-result checklist
Enter results from the external load-calculation program, document field constraints, and identify when a technical review is needed.
Project readiness checklist
Confirm the supporting information is available before relying on the result.
Floor-by-floor observations
Keep registers, thermostats, return locations, drops, and wall-cavity returns attached to the floor where they were observed.
Load Calculation Results
Entered from an external load-calculation program. GreyModule does not calculate or modify these results.
Duct trunks
Enter width and height in inches. Add every major trunk that serves the home; GreyModule uses the combined area for an approximate capacity estimate.
Guide reference: 80 sq. in./ton hard ducting; 113 sq. in./ton flex ducting; 144 sq. in./ton return grilles.
Equipment and site observations
Record the existing fuel/equipment path, electrical information, zoning, venting, and comfort conditions.
Admin editor
Edit the checklist and decision rules without changing application code. Changes are saved to this browser as a draft.